Filter content by area of interest
Ports & Terminals
Port AuthoritiesContainerBulkBreakbulk/General CargoRo-Ro/AutomotiveGTOs
Cargo Handling Equipment
STS CranesYard CranesMobile CHERo-Ro EquipmentBreakbulk EquipmentLow ThroughputBulk Handling Equipment
Shipping & Logistics
Container ShippingBreakbulk/General CargoRo-Ro ShippingDry Bulk ShippingLiquid cargoesLogistics
ICT
TOSPlanning & Optimisation TechnologyWiFiMobile ComputingPort Community SystemsAsset Tracking & Monitoring
Automation
Automated EquipmentGate AutomationRemote ControlProcess Automation
Multimodal
RailInland WaterwaysShortsea ShippingRoadAir-Cargo
Container Industry
Container manufactureContainer leasingRepair/StorageTradingConversion/Innovation
Refrigeration
Operations/TransportContainer leasingEquipmentM&R/Storage
Breakbulk
General cargoProject Cargo/Heavy LiftForest productsRo-Ro/AutomotiveAgribulks
Safety & Security
InsuranceHazardous cargoLashings/SecuringLegal/Regulatory
Civil Engineering
Port & terminal construction/designCivil & Consulting EngineersDredging & ReclamationMooring & FenderingLightingPaving & Surfacing
Environment
Business
InsuranceLegal/RegulatoryAppointments/PeopleMergers/Acquisitions/RestructuringFinance/Financial ResultsTrade & Professional AssociationsBusiness/Commerce Miscellaneous
 View all Topics View all Topics A-Z
More View all Topics View all Topics A-Z

You are viewing 1 of your 1 guest articles


register  or  login  for full access to online news

Elbe deepening and widening finally under way

After around 17 years and many court cases in Germany and Europe, the Elbe fairway dredging project is finally under way

Linked InTwitterFacebookeCard
Elbe deepening and widening finally under way

German Federal Minister for Transport Andreas Scheuer, assisted by Hamburg’s senator for economic affairs Michael Westhagemann and several leading figures from business and civil affairs, "pushed the button" to get the deepening work under way on the suction pipe of the dredger SCHELDT RIVER.

 

In future the draft of the Elbe will be 13.50m irrespective of tide and low water and, on a flood wave, vessels with 14.50m can reach the port of Hamburg. The fairway will be widened from 300m to 320m and, near Wedel, a passing box (Begegnungsbox )measuring 8,000m long and 385m wide will be built, to provide passing space for four large container vessels passing.

 

Around 40M m3 of material will be dredged. The entire project to completion in 2021 is budgeted at €780M, similar to the cost of Hamburg’s new Elbphilarmonie concert hall, which will be split between the Federal government and the city of Hamburg.

Suction dredger SCHELDT RIVER inaugurated the 3-year programme
Suction dredger SCHELDT RIVER inaugurated the 3-year programme

Minister Scheuer stressed the importance of the project not only for Hamburg, but also for Germany as an important export country. “Hamburg serves all of Germany and is Bavaria’s seaport," he said.

 

Environmental groups including BUND, NABU, along with many residents and professional fishermen have again called for the project to be halted. Despite official assurances, It is claimed that dikes, flora and fauna are endangered by the extra flow of salt water into the Elbe.

 

Olaf Lies, former finance minister and now minister for the environment of the state of Lower Saxony, commented that JadeWeserPort, in his state, is Germany’s port for very large container vessels.

Linked InTwitterFacebookeCard

You may also be interested in...

ZPMC moves in

Bunking up the logs for easy moves

Pulp facts to the fore in Montevideo

Hyster clamps up on reel handling

Sizing up the breakbulk market

Getting on the intermodal track

Related Stories

Port Solutions sells MHC to Arinaga operator

The Germany-based used port handling equipment trader has sold another mobile ha...

Buenos Aires plan under major threat

The victory of Alberto Fernández in Argentina’s general election threatens to sc...

Lübeck in cars for Russia deal

For the first time, Lübeck is a port for new automobiles. Finnlines will transpo...

ABP Southampton in £4.3M project

Ro-Ro/PCTCs: Southampton has begun a further phase of planned investment to maxi...
Linked In
Twitter