Fairway deepening starts at Port of Gothenburg
NewsThe dredging will take the fairway from 13.5m to a maximum 17.5m ship draught and the channel will be able to accommodate ships up to 430m long and 65m wide.
The fairway to the container terminal will be deepened by 4m to 17.5m by 2026
By registering you will have: